Customer Story
Ford's Sustainable Data Center: 540,288 kWh Energy Reduction & $35,000 Operating Cost Savings
Ford Motor Company's Dearborn campus achieved remarkable energy savings of 540,288 kWh and reduced CO2 emissions by over 330 metric tons through a cutting-edge, sustainable chiller plant implementation. Learn about Trane's high-efficiency CenTraVac® centrifugal chillers, low GWP refrigerants, and reliable solutions for a mission-critical data center
Customer Story
Cyxtera Data Center: Energy-Efficient Cooling and Cost Savings
Upgrades to Cyxtera's chiller plant and pumping system controls led to a decrease in energy consumption of 0.7 kW/ton, resulting in over $2,100,000 in annual energy cost savings
Customer Story
Sustainable Data Center Solutions for Cape Augusta Digital Properties
Innovative alternative system projected to reduce energy use by about two-thirds; to provide reliable, lower-cost environment for tenants • Augusta, GA
Built in 1881, on the historic site of the Confederate Powder Works, Cape August Digital Properties is being developed by Cape Augusta Digital Properties into a major regional data center. The data center development and management company expects to lease portions of the historical property to technology companies, data center users and operators, integrators and cybersecurity educators.
Customer Story
ARRIS Group, Inc.
ARRIS Group requires 99 percent or better uptime for their global data center. Trane provided a total system-integrated service solution that includes central monitoring of sixty-nine alarm and event points that are mission critical to delivering uptime. Trane field service technicians deliver a Performance Based Service Agreement with custom defined performance metrics tailored to meet the specific needs of ARRIS. The HVAC system equipment includes fifty-four rooftop units, one air-cooled 225-ton chiller and Trane Tracer™ controls.